How a card runs

After you accept the preview, each card goes through these stages. Every role is a separate minion session.

plan -> tests -> build -> gate -> qa + review -> done
                   ^                  |
                   +----- replan <----+   (max 2, then it comes to you)
  1. Plan (planner): steps, and which check proves each definition-of-done (DoD) line. Doubts become questions, not guesses.
  2. Tests (swe A): writes the verification only, one test per DoD line plus bad days, and shows each fails for the right reason. The planner checks coverage. Non-code work gets a checklist, script or link check instead.
  3. Build (swe B, fresh session): makes the pinned tests pass. Pinned tests are read-only.
  4. Gate (Gru, deterministic): tests byte-identical, acceptance commands pass, only owned files touched, sane diff, no secrets. Gru never trusts "done".
  5. QA hunts bugs, edge cases and hard-to-maintain code. The reviewer ticks the DoD line by line with evidence and reviews the diff. Both also cover what the project said it expects and its extra checks; any evidence that needs a tool (Asana, Jira, ...) is gathered by Gru and handed over, and a check Gru cannot gather is reported unverified, never guessed.

To run just one of these stages on work that already exists, see Single stages.

Findings

Kind Meaning Effect
blocking DoD line unmet, failing check, bug, security, scope violation replan
should-fix smell, missing edge case, maintainability folded into a replan if cheap, else handed back
note advisory handed back

Replan

The card's own planner gets the findings and writes a delta plan: keep what passed, change only what was flagged. Pinned tests change only if the planner shows they were wrong. After 2 replans the card goes to you with a diagnosis. The planner may recommend a bump (swe up one slot); that costs more, so Gru asks unless your profile says autonomy: bump_ok.

When Gru asks you

An ambiguous or wrong card or DoD, a doubt the repo cannot answer, two replans used, qa and reviewer disagreeing on something that matters (non-blocking disagreements: the reviewer decides), a bump or split, an L/XL sign-off, a budget cap or hard stop, a broken harness with no fallback.

Hand-back

Gru returns a structured result to whoever called it (you, or an agent): per card the status, branch or PR, evidence for every DoD line, open should-fix items, and what needs input, plus one command that re-checks the whole feature. The caller verifies it or delivers (opens the PR, sends the file). Gru delivers itself only per your project's mode and with your OK.